X17B1 SCHEDULE - February-April 2001 |
||||||
|
Sun |
Mon |
Tue |
Wed |
Thu |
Fri |
Sat |
|
February 18 00-2400
Ops. |
February 19 Holiday 00-2400 Ops. MOVE PRESS IN |
February 20 00-1200
Studies 12-2400 Maint. |
February 21 00-2400 Maint. |
February 22 00-1200 Studies; 12-2400 Ops. Alignment |
February 23 00-2400 Ops. Liping Wang: GAR16 Jianzhong Zhang: MOS01 |
February 24 00-2400 Ops. Jianzhong Zhang: MOS01 Jiuhua Chen: TIT03 |
|
February 25 00-1200 Ops. Jennifer Kung: CAT01 12-2400
Studies |
February 26 00-0600 Studies Jennifer Kung: CAT01 06-1200 Intlk. 12-2400 Studies |
February 27 00-1200 Studies 12-2400 Ops ULTRASONIC SETUP |
February 28 00-2400 Ops.
|
March 1 00-2400 Ops.
Baosheng
Li: DIO05 |
March 2 00-2400 Ops Jennifer Kung: MWU04 WIGGLER REPAIR |
March 3 00-2400 Ops. WIGGLER REPAIR |
|
March 4 00-2400 Ops. WIGGLER REPAIR |
March 5 00-1200 Ops. WIGGLER REPAIR 12-2400
Studies |
March 6 00-2400 Studies Jennifer Kung: MWU04 |
March 7 00-1200
Studies 12-2400 Ops. Kenneth
Darling: OLI25 |
March 8 00-2400 Ops.
Jennifer
Kung: OEN09 |
March 9 00-2400 Ops. change to mono Jiuhua
Chen: OLI26 |
March 10 00-2400 Ops. Jianzhong Zhang: DOL04 Jiuhua
Chen: OEN10 |
|
March 11 00-2400 Ops. Jiuhua Chen: OLI27 |
March 12 00-1200 Ops. Jiuhua
Chen: OLI27 12-2400
Studies |
March 13 00-1200 Studies Install
conical slit/13 element detector 12-2400
Maint. |
March 14 00-2400 Maint. Install
conical slit/13 element detector |
March 15 00-1200
Studies 12-2400 Ops. Install
conical slit/13 element detector |
March 16 00-2400 Ops.
Install
conical slit/13 element detector |
March 17 00-2400 Ops.
Install
conical slit/13 element detector |
|
March 18 00-2400 Ops. Install
conical slit/13 element detector |
March 19 00-2400 Ops Don Weidner: NAC11 V. Solozhenko: BCN01 |
March 20 00-0800 Ops. Template 08-2400 Ops. V. Solozhenko: BCN01 Liping Wang: OEN11 |
March 21 00-2400 Ops.
V. Solozhenko: BCN02 |
March 22 00-2400 Ops.
Yusheng
Zhao: NAF01 |
March 23 00-2400 Ops.
V.
Solozhenko: C3N01 |
March 24 00-2400 Ops.
Yusheng Zhao: DIA11 |
|
March 25 00-1200 Ops. V.
Solozhenko: C3N02 12-2400
Studies |
March 26 Tcup/conical slit Paul Raterron: FOR14 06-1200 Intlk. 12-2400 Studies |
March 27 00-1200 Studies 12-2400 Ops. Tcup/conical slit Liping Wang: ABG45 |
March 28 00-2400 Ops. Tcup/conical slit |
March 29 00-2400 Ops. Paul Raterron: FOR15 Ring Down - no beam |
March 30 00-2400 Ops. Tcup/conical slit Ring Down - no beam |
March 31 00-2400 Ops.
Tcup/conical slit
Li Li: OLI29 Jiuhua Chen: FAY13 |
|
April 1 00-2400 Ops. Tcup/conical slit Jianzhong
Zhang: MOS02 |
April 2 00-2400 Ops. Tcup/conical
slit Liping Wang: ABG46 |
April 3 00-2400 Ops.
Paul Raterron: FOR16 Li Li: MGO36 |
April 4 00-2400 Ops. Tcup with Ultrasonics Baosheng Li: CAS17 |
April 5 00-2400 Ops. Wiggler Down - no beam change
back to DIA |
April 6 00-2400 Ops. Wiggler Down - no beam |
April 7 00-2400 Ops. Wiggler Down - no beam |
|
April 8 00-2400 Ops. Wiggler
Down - no beam |
April 9 00-2400 Ops. DIA
with Ultrasonic Kenneth Darling: FOR30 |
April 10 00-1200
Ops. 12-2400 Maint. MOVE
PRESS OUT |
April 11 00-2400
Maint. |
April 12 00-1200 Studies 12-2400 Ops. |
April 13 00-2400
Ops. |
April 14 00-2400
Ops. |
Next beam time: September-November, 2001 (exact date to be determined). Submit your general users' proposals by May 30