Next beam time: September-November, 2001 (exact date to be determined).  Submit your general users' proposals by May 30

X17B1 SCHEDULE - February-April 2001

Sun

Mon

Tue

Wed

Thu

Fri

Sat

February 18

00-2400 Ops.

February 19 Holiday

00-2400 Ops.

MOVE PRESS IN

February 20

00-1200 Studies

12-2400 Maint.

February 21

00-2400 Maint.

February 22

00-1200 Studies; 12-2400 Ops.

Alignment

February 23

00-2400 Ops.

DIA without US 

Liping Wang: GAR16

Jianzhong Zhang: MOS01

February 24

00-2400 Ops.

DIA without US 

Jianzhong Zhang: MOS01

Jiuhua Chen: TIT03

February 25

00-1200 Ops.

DIA without US 

Jennifer Kung: CAT01

12-2400 Studies

February 26

00-0600 Studies

Jennifer Kung: CAT01

06-1200 Intlk.

12-2400 Studies

February 27

00-1200 Studies

12-2400 Ops

ULTRASONIC SETUP

February 28

00-2400 Ops.

 

March 1

00-2400 Ops.

 

DIA WITH US 

Baosheng Li: DIO05

March 2

00-2400 Ops

DIA WITH US 

Jennifer Kung: MWU04

WIGGLER REPAIR

March 3

00-2400 Ops.

WIGGLER REPAIR

March 4

00-2400 Ops.

WIGGLER REPAIR

March 5

00-1200 Ops.

WIGGLER REPAIR

12-2400 Studies

March 6

00-2400 Studies

WIGGLER REPAIR

DIA WITH US 

Jennifer Kung: MWU04

March 7

00-1200 Studies

12-2400 Ops.

DIA WITH US 

Kenneth Darling: OLI25

March 8

00-2400 Ops.

 

DIA WITH US 

Jennifer Kung: OEN09

March 9

00-2400 Ops. 

change to mono

DIA Monchromatic with CCD+Imaging Plate 

Jiuhua Chen: OLI26

March 10

00-2400 Ops.

DIA Monchromatic with CCD+Imaging Plate 

Jianzhong Zhang: DOL04

Jiuhua Chen: OEN10

March 11

00-2400 Ops.

DIA Monchromatic with CCD+Imaging Plate 

Jiuhua Chen: OLI27

March 12

00-1200 Ops.

DIA Monchromatic with CCD+Imaging Plate 

Jiuhua Chen: OLI27

12-2400 Studies

March 13

00-1200 Studies

Install conical slit/13 element detector

12-2400 Maint.

March 14

00-2400 Maint.

Install conical slit/13 element detector

March 15

00-1200 Studies

12-2400 Ops.

Install conical slit/13 element detector

March 16

00-2400 Ops.

 

Install conical slit/13 element detector

March 17

00-2400 Ops.

 

Install conical slit/13 element detector

March 18

00-2400 Ops.

Install conical slit/13 element detector

March 19

00-2400 Ops

Tcup/conical slit 

Don Weidner: NAC11

V. Solozhenko: BCN01

March 20

00-0800 Ops. Template

08-2400 Ops.

Tcup/conical slit 

V. Solozhenko: BCN01

Liping Wang: OEN11

March 21

00-2400 Ops.

 

Tcup/conical slit 

V. Solozhenko: BCN02

March 22

00-2400 Ops.

 

Tcup/conical slit 

Yusheng Zhao: NAF01

March 23

00-2400 Ops.

 

Tcup/conical slit 

V. Solozhenko: C3N01

March 24

00-2400 Ops.

 

Tcup/conical slit 

Yusheng Zhao: DIA11

March 25

00-1200 Ops.

Tcup/conical slit 

V. Solozhenko: C3N02

12-2400 Studies

March 26

00-0600 Studies

Tcup/conical slit 

Paul Raterron: FOR14

06-1200 Intlk.

12-2400 Studies

March 27

00-1200 Studies 12-2400 Ops.

Tcup/conical slit 

Liping Wang: ABG45

March 28

00-2400 Ops.

Tcup/conical slit

Li Li: OLI28

March 29

00-2400 Ops.

Tcup/conical slit

Paul Raterron: FOR15

Ring Down - no beam

March 30

00-2400 Ops.

Tcup/conical slit

Ring Down - no beam

March 31

 

00-2400 Ops.

 

Tcup/conical slit

 

Li Li: OLI29

Jiuhua Chen: FAY13

April 1

00-2400 Ops.

Tcup/conical slit

Jianzhong Zhang: MOS02

April 2

00-2400 Ops.

Tcup/conical slit

Liping Wang: ABG46

April 3

00-2400 Ops.

Tcup/conical slit

 

Paul Raterron: FOR16

Li Li: MGO36

April 4

00-2400 Ops.

Tcup with Ultrasonics

Baosheng Li: CAS17

April 5

00-2400 Ops.

Wiggler Down - no beam

change back to DIA

April 6

00-2400 Ops.

Wiggler Down - no beam

April 7

00-2400 Ops.

Wiggler Down - no beam

April 8

00-2400 Ops.

Wiggler Down - no beam

April 9

00-2400 Ops.

DIA with Ultrasonic

Kenneth Darling: FOR30

April 10

00-1200 Ops.

12-2400 Maint.

MOVE PRESS OUT

April 11

00-2400 Maint.

April 12

00-1200 Studies

12-2400 Ops.

April 13

00-2400 Ops.

April 14

00-2400 Ops.

Next beam time: September-November, 2001 (exact date to be determined).  Submit your general users' proposals by May 30